Hithium starts manufacturing ‘world-first’ 1175Ah cell as industry ‘enters era of LDES’
Hithium | Source: Energy Storage | Posted 06/16/2025

The firm announced a new 6.25MWh BESS product using the 1175Ah cells at the ees Europe trade show and conference in Munich, Germany, last month. Then at the start of June, it announced that it had started manufacturing battery modules and BESS units at a facility in Texas, US.
AI generated summary
Hithium, a lithium-ion OEM focused on energy storage, has commenced mass production of the world's first 1,175Ah battery cell, aimed at long-duration energy storage (LDES) applications. This significant advancement, announced on June 11, 2023, takes place at their facility in Chongqing, China, and marks a notable increase from the widely used 314Ah cells and the newer 600Ah variants.
The development of the 1175Ah cell incorporates innovations in manufacturing processes, including enhanced coating precision and improved cell structure design. Additionally, Hithium has entered a strategic partnership with Israeli firm El Mor for an LDES project in Romania, which is receiving EU funding for energy storage initiatives. The 1175Ah cell is expected to set a new standard in the energy storage sector, with Hithium also unveiling a 6.25MWh battery energy storage system (BESS) product at the ees Europe trade show in Munich.
Link to Original Article
Please find the link to the full article below. (Please note that content provider might require a paid subscription)
Source Link: https://www.energy-storage.news/hithium-starts-manufacturing-world-first-1175ah-cell-as-industry-enters-era-of-ldes/
06/16 - 9:30 AM
ERCOT - Residential Demand Response Workshop06/16 - 9:30 AM
ERCOT - OWG Meeting - Webex Only06/16 - 9:30 AM
ERCOT - PLWG Meeting06/17 - 12:00 AM
06/16/2025
06/16/2025 Residential Demand Response Workshop06/16/2025
06/16/2025 OWG Meeting06/16/2025
06/16/2025 CMWG Meeting06/16/2025
Hithium starts manufacturing ‘world-first’ 1175Ah cell as industry ‘enters era of LDES’06/16/2025
Meeting the challenge of FERC Order 881: Why open source matters for AAR implementationAPPLICATION OF EL PASO ELECTRIC COMPANY FOR AUTHORITY TO CHANGE RATES - (162 filings)
BROKER REGISTRATIONS - (72 filings)
APPLICATION OF ENTERGY TEXAS, INC. TO AMEND ITS CERTIFICATE OF CONVENIENCE AND NECESSITY FOR THE SETEX AREA RELIABILITY PROJECT IN JASPER, MONTGOMERY, NEWTON, POLK, SAN JACINTO, TRINITY, TYLER, AND WALKER COUNTIES - (54 filings)
PROJECT TO SUBMIT EMERGENCY OPERATIONS PLANS AND RELATED DOCUMENTS UNDER 16 TAC § 25.53 - (44 filings)
APPLICATION OF CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC FOR DETERMINATION OF SYSTEM RESTORATION COSTS - (42 filings)
YEAR-END 2024 ELECTRIC UTILITY EARNINGS REPORTS IN ACCORDANCE WITH 16 TAC § 25.73 - (34 filings)
CY 2025 ELECTRIC UTILITY TRANSMISSION CONSTRUCTION REPORTS UNDER 16 TAC § 25.83 - (32 filings)