Soluna unveils its 1st solar-powered data centre project in Texas
Martina Markosyan | Source: RenewablesNow | Posted 05/23/2025

US green data centres developer Soluna Holdings Inc (NASDAQ:SLNH) has unveiled its first solar-powered project, a 75-MW data centre co-located with a 114-MW solar farm in northeast Texas.
AI generated summary
Soluna Holdings Inc has announced its first solar-powered data centre project, named Project Annie, located in northeast Texas. This facility will feature a 75-MW data centre co-located with a 114-MW solar farm, developed in collaboration with a local renewable energy operator. The project aims to convert underutilized solar energy into high-performance computing resources.
As part of the next steps, Soluna will finalize power purchase agreements, land agreements, and ERCOT planning for the facility. With this project, the company expands its development pipeline to over 773 MW across various renewable energy initiatives, including wind and solar-powered computing. Currently, Soluna operates three sites totaling 75 MW, utilizing both wind and grid power.
Link to Original Article
Please find the link to the full article below. (Please note that content provider might require a paid subscription)
Source Link: https://renewablesnow.com/news/soluna-unveils-its-1st-solar-powered-data-centre-project-in-texas-1275719/
05/23 - 7:00 AM
LEGE - Senate Business & Commerce05/23 - 8:00 AM
LEGE - House 89th Legislative Session05/23 - 10:00 AM
LEGE - Senate Session05/23 - 11:00 AM
05/23/2025
House passes more bruising budget bill for solar industry05/23/2025
Nuclear industry ‘facing some headwinds’ amid congressional budget fight: NEI CEO05/23/2025
Solar energy on the rise in America05/23/2025
Soluna unveils its 1st solar-powered data centre project in Texas05/23/2025
FERC Staff Releases 2025 Summer Energy Market and Electric Reliability AssessmentAPPLICATION OF ENTERGY TEXAS, INC. TO AMEND ITS CERTIFICATE OF CONVENIENCE AND NECESSITY FOR THE SETEX AREA RELIABILITY PROJECT IN JASPER, MONTGOMERY, NEWTON, POLK, SAN JACINTO, TRINITY, TYLER, AND WALKER COUNTIES - (192 filings)
APPLICATION OF EL PASO ELECTRIC COMPANY FOR AUTHORITY TO CHANGE RATES - (124 filings)
CY 2025 RETAIL PERFORMANCE MEASURE REPORTS PURSUANT TO 16 TAC 25.88 - (121 filings)
BROKER REGISTRATIONS - (89 filings)
APPLICATION OF CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC FOR APPROVAL OF ITS 2026-2028 TRANSMISSION AND DISTRIBUTION SYSTEM RESILIENCY PLAN - (66 filings)
PROJECT TO SUBMIT EMERGENCY OPERATIONS PLANS AND RELATED DOCUMENTS UNDER 16 TAC § 25.53 - (55 filings)
CY 2024 ANNUAL POWER LINE INSPECTION & SAFETY REPORT IN PURSUANT TO 16 TAC § 25.97(F) - (50 filings)