The Chairman of Texas’ Public Utility Commission Has a To-Do List

Arcelia Martin | Source: Inside Climate News | Posted 05/21/2025

Keyword Tags:

The electricity regulator is looking to regain the public’s trust after Winter Storm Uri and build out infrastructure to support the boom in electricity demand for data centers.


AI generated summary

The Chairman of Texas' Public Utility Commission (PUC), Thomas Gleeson, is focused on rebuilding public trust in the agency following the fallout from Winter Storm Uri, which highlighted significant weaknesses in the state's electric grid. During his confirmation hearing, Gleeson outlined his top priorities, starting with restoring faith in the PUC's oversight of utilities. The storm, which resulted in numerous fatalities, raised concerns about the reliability of power supply in Texas, prompting the PUC to take steps to improve its reputation and ensure better management of the state's electricity infrastructure.

Gleeson's second priority involves protecting ratepayers while expanding infrastructure to meet the growing electricity demand, particularly from data centers. The PUC has approved plans for new high-voltage transmission lines to support the increasing power needs of the Permian Basin. Lastly, Gleeson aims to repair relationships among stakeholders in the ERCOT grid, which were strained after the storm. He emphasizes the importance of public engagement and transparency, highlighting his commitment to improving communication with the community and addressing the concerns of both residential and commercial electricity users.



Link to Original Article

Please find the link to the full article below. (Please note that content provider might require a paid subscription)


Source Link: https://insideclimatenews.org/news/20052025/the-chairman-of-texas-public-utility-commission-has-a-to-do-list/

Create a free trial account: Sign Up

Grid monitor is free to try. No credit card required


Already have an account? Login

Upcoming Meetings
Most Active PUCT Filings

APPLICATION OF ENTERGY TEXAS, INC. TO AMEND ITS CERTIFICATE OF CONVENIENCE AND NECESSITY FOR THE SETEX AREA RELIABILITY PROJECT IN JASPER, MONTGOMERY, NEWTON, POLK, SAN JACINTO, TRINITY, TYLER, AND WALKER COUNTIES - (181 filings)

APPLICATION OF EL PASO ELECTRIC COMPANY FOR AUTHORITY TO CHANGE RATES - (131 filings)

CY 2025 RETAIL PERFORMANCE MEASURE REPORTS PURSUANT TO 16 TAC 25.88 - (122 filings)

BROKER REGISTRATIONS - (90 filings)

APPLICATION OF CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC FOR APPROVAL OF ITS 2026-2028 TRANSMISSION AND DISTRIBUTION SYSTEM RESILIENCY PLAN - (70 filings)

PROJECT TO SUBMIT EMERGENCY OPERATIONS PLANS AND RELATED DOCUMENTS UNDER 16 TAC § 25.53 - (56 filings)

CY 2024 ANNUAL POWER LINE INSPECTION & SAFETY REPORT IN PURSUANT TO 16 TAC § 25.97(F) - (55 filings)