8.1 - PGRR107, Related to NPRR1180, Inclusion of Forecasted Load in Planning Analyses
Motion to table PGRR107 added to combo ballot.
ERCOT needs to wait until the November meeting to complete the Impact Analysis (IA) for PGRR107.
8.2 - PGRR116, Related to NPRR1240, Access to Transmission Planning Information
Motion to endorse and forward to TAC the 9/9/24 ROS Report and 7/2/24 Impact Analysis for PGRR116 added to combo ballot.
No impact IA.
8.3 - NOGRR266, Related to NPRR1239, Access to Market Information
Motion to endorse and forward to TAC the 9/9/24 ROS Report and 7/2/24 Impact Analysis for NOGRR266 added to combo ballot,
No impact IA.
8.4 - NOGRR267, Related to NPRR1240, Access to Transmission Planning Information
Motion to endorse and forward to TAC the 9/9/24 ROS Report and 7/2/24 Impact Analysis for NOGRR267 added to combo ballot.
No impact IA.
8.5 - PGRR119, Stability Constraint Modeling Assumptions in the Regional Transmission Plan
Motion to table PGRR119 and refer issue to PLWG added to combo ballot.
Reviewed PGRR119 for stability constraint modeling assumptions in the Regional Transmission Plan (RTP).
The revision will codify the use of a reliability margin when modeling limits associated with this stability constraint in the RTP reliability and economic base cases.
Suggestion to have Dylan's group take up this issue.
Proposal to table and refer it to the Planning Working Group (PLWG).
9 - Revision Requests Tabled at PRS and Referred to ROS Possible Vote
Two revision requests are currently tabled.
9.1 - NPRR1229, Real-Time Constraint Management Plan Energy Payment
NPRR1229 is currently at WMWG.
Responses were provided by STEC to policy level questions posed by ERCOT.
No current role for ROS as WMWG is still working through the issues.
9.2 - NPRR1234, Interconnection Requirements for Large Loads and Modeling Standards for Loads 25 MW or Greater NDSWG
NDSWG did not meet in September; additional comments from steel mills are expected to be discussed at the next meeting.
Item NPRR1234 remains tabled for future discussion.
PGRR107 is to be tabled pending further information expected in November.
10 - Revision Requests Tabled at ROS (Possible Vote)
10.1 - PGRR073, Related to NPRR956, Designation of Providers of Transmission Actions
Not discussed
10.2 - NOGRR268, Related to NPRR1246, Energy Storage Resource Terminology Alignment for the Single-Model Era
Motion to recommend approval of NOGRR268 as amended by the 9/24/24 ERCOT comments added to combo ballot.
Items NOGRR268 and PGRR118 were previously tabled but were proposed to be moved forward as RTC discussions went smoothly.
ERCOT submitted comments on NOGRR268 and PGRR118, proposing modifications to clarify language regarding generation and energy storage.
The proposed language changes suggest references to 'generation' would inherently include energy storage, thus additional mentions of energy storage are unnecessary.
The group agrees to move forward with ERCOT's proposed modifications to these items.
10.3 - PGRR118, Related to NPRR1246, Energy Storage Resource Terminology Alignment for the Single-Model Era
Motion to recommend approval of PGRR118 as amended by the 9/20/24 ERCOT comments added to combo ballot.
11.1 - NPRR1070, Planning Criteria for GTC Exit Solutions OWG, PLWG Possible Vote
ERCOT is collaborating with PUC staff to finalize the language.
The discussion on this item remains tabled at the Operating Working Group (OWG).
11.2 - NPRR1238, Voluntary Registration of Loads with Curtailable Load Capabilities OWG Possible Vote
Oncor filed comments on April 18, 2024, regarding voluntary registration of loads with curtailable load capabilities.
OWG reached consensus on Oncor's comments at their last meeting.
ERCOT presented use cases during the meeting demonstrating the impact of considering VECLs on total load for load shedding.
ERCOT's example showed specific entities' load at 0.39% of ERCOT's total load, which could rise to 2.75% if VECls were included.
11.3 - NOGRR265, Related to NPRR1238, Voluntary Registration of Loads with Curtailable Load Capabilities OWG Possible Vote
Oncor filed comments on NOGRR265 and OWG reached a consensus on these comments.
Fred provided a status update on NPRR1238 comments, stating they are close to finalizing and expect to file them before the upcoming October OWG meeting.
Consensus generally aligns with Oncor’s comments, with clarifications needed on low shader calculations and ramping codification.
Blake from LCRA expressed concerns about the lack of a remote control disconnection device requirement for VECL at the DSP level, suggesting language to address this.
Golden Spread's Chris mentioned no anticipated distribution disconnects for VECLs and emphasized the need for coordination with ERCOT.
Ken Bowen from CPS Energy raised the issue of load ratio share calculation related to transmission projects and entity recovery rates.
Lloyd commented on the safety aspects of remote control of breakers for large loads, advocating for notice and adherence to good utility practices.
Ricky discussed the process of OWG referring additional comments on NOGRR and NPRR back to OWG, and agreed to reconsider them next month.
Bob Whitmer emphasized the urgency of implementing early curtailment loads to protect firm loads and prevent unnecessary risk to vulnerable populations.
15 - Inverter Based Resources Working Group IBRWG Julia Matevosyan
Discussed procedure manual update with changes from DWG manual and updated tools for testing.
Mark Henry presented a standards update with three standards developed; PRC-030 and PRC-028 received sufficient votes, PRC-029 faced industry disagreements.
Fred Huang presented a draft proposal for advanced grid support from energy storage resources with a focus on grid forming functions; ERCOT seeking feedback.
Addressed primary frequency response performance issues in inverter based resources, specifically wind and solar under deep curtailment.
ERCOT continues to seek feedback from OEMs to understand technology limitations and propose solutions.
Update on NOGRR245, which has been approved at PUC with a follow up NOGRR to be developed.
Discussed ROCOF and phase jump measurement items; understanding OEM methods for frequency measurement and response.
ERCOT aims to align evaluation methods with OEM limitations for frequency response and ROCOF assessment.
Fred provided update on tentative schedule for advanced grid support ESR adoption request, aiming for end-of-year submission.
Next Meeting Date: October 11
16 - Performance, Disturbance, Compliance Working Group PDCWG Kevin Bunch
Aircraft operator certification exam has been temporarily suspended due to issues with testing centers. Notification sent to market participants on September 9.
Efforts are ongoing to resolve certification exam issues; notifications will be sent upon resolution.
Annual ERCOT Blackstart training seminar scheduled from October 15 - November 21, including computer-based training and in-person simulation exercises.
Participants can earn continuing education hours (CEHs), must complete the entire day's session for credit.
Computer-based training is released weekly, attendees can contact ERCOT service desk for assistance.
ERCOT TSP IRL training is under initial discussion to develop objectives and content, focused on TOS with sensitive topics.
No additional questions or comments were raised during the session.
19 - Black Start Working Group BSWG Michael Dieringer
The Blackstart Working Group met on September 19 in a closed session.
Topics included how to utilize DEERS during black start events.
A roundtable Q&A session was held between the working group, DEERS, and ERCOT.
Additional information will be provided in the future.
Preliminary stages of a NOGRR for satellite phone requirements were discussed.
Participants received a copy of the NOGRR to review and provide feedback by the next meeting.
A vote confirmed Michael Dieringer as chairman and Alex Lee as vice-chair.
Blackstart plans are due on November 1.
The next meeting will occur on December 11, requiring an NDA for participation.