Energy Vault announces successful completion of Cross Trails BESS in Texas

Robin Whitlock | Source: Renewable Energy Magazine | Posted 06/12/2025

Keyword Tags:

Grid-scale energy storage solutions specialist Energy Vault Holdings Inc has announced the successful completion and start of commercial operation of the 57 MW two-hour Cross Trails BESS in Scurry County, Texas – the first fully complete asset under Energy Vault’s ‘Own & Operate’ growth strategy.


AI generated summary

Energy Vault Holdings Inc has successfully completed the 57 MW two-hour Cross Trails Battery Energy Storage System (BESS) in Scurry County, Texas, marking the first fully operational asset under its 'Own & Operate' growth strategy. The project was finished ahead of schedule, thanks to effective project management and collaboration among various teams. The commissioning process also concluded early, allowing the facility to enter commercial operation sooner than planned, facilitated by Energy Vault's innovative B-VAULT AC system.

The Cross Trails BESS will enhance grid resiliency in the ERCOT region and is backed by a 10-year offtake agreement with AI-driven power marketer Gridmatic. This agreement is notable as it is the first physically settled revenue floor contract for a BESS in ERCOT, leveraging Gridmatic's AI-based forecasts for optimal energy trading. Energy Vault's Chief Revenue Officer, Marco Terruzzin, emphasized that this achievement underscores the company's capability to execute complex energy storage projects efficiently and economically, aligning with their long-term growth strategy.



Link to Original Article

Please find the link to the full article below. (Please note that content provider might require a paid subscription)


Source Link: https://www.renewableenergymagazine.com/storage/energy-vault-announces-successful-completion-of-cross-20250611

Create a free trial account: Sign Up

Grid monitor is free to try. No credit card required


Already have an account? Login

Most Active PUCT Filings

APPLICATION OF EL PASO ELECTRIC COMPANY FOR AUTHORITY TO CHANGE RATES - (168 filings)

BROKER REGISTRATIONS - (77 filings)

CY 2025 RETAIL PERFORMANCE MEASURE REPORTS PURSUANT TO 16 TAC 25.88 - (75 filings)

APPLICATION OF ENTERGY TEXAS, INC. TO AMEND ITS CERTIFICATE OF CONVENIENCE AND NECESSITY FOR THE SETEX AREA RELIABILITY PROJECT IN JASPER, MONTGOMERY, NEWTON, POLK, SAN JACINTO, TRINITY, TYLER, AND WALKER COUNTIES - (54 filings)

YEAR-END 2024 ELECTRIC UTILITY EARNINGS REPORTS IN ACCORDANCE WITH 16 TAC § 25.73 - (44 filings)

PROJECT TO SUBMIT EMERGENCY OPERATIONS PLANS AND RELATED DOCUMENTS UNDER 16 TAC § 25.53 - (43 filings)

APPLICATION OF CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC FOR DETERMINATION OF SYSTEM RESTORATION COSTS - (42 filings)