Exceed GeoEnergy signs 110-MW geothermal PPA with Presidio, Texas

Carlo Cariaga | Source: Think Geo Energy | Posted 05/30/2025

Keyword Tags:

Exceed Geo Energy has signed a 110-MW geothermal PPA with Presidio, Texas, providing stable power and commercial development opportunities for the region.


AI generated summary

Exceed Geo Energy has entered into a significant 110-MW geothermal power purchase agreement (PPA) with the Presidio Municipal Development District (PMDD) in Presidio County, Texas. This agreement, formalized during the 'Presidio Vision 2035' student competition, is expected to greatly enhance the region's electricity capacity, surpassing current local demand and positioning Presidio as a strategic location for industrial development. The geothermal facility is also anticipated to provide stability to the local power grid, which has faced outages, and could serve as a blackstart resource to restore power during major outages.

John T. Kennedy, PMDD Executive Director, emphasized that this commitment goes beyond meeting energy needs; it lays the groundwork for economic growth by providing reliable, clean power for various industries. The project builds on a resource assessment conducted by the University of Texas Bureau of Economic Geology, validating the geothermal potential in the area. With commercial operations expected to begin by late 2026, the initial phase will activate 9.9 MW, eventually expanding to the full capacity. This development is seen as a strategic move to leverage Presidio's unique advantages in international trade and access to geothermal resources, ultimately transforming the regional economy.



Link to Original Article

Please find the link to the full article below. (Please note that content provider might require a paid subscription)


Source Link: https://www.thinkgeoenergy.com/exceed-geoenergy-signs-110-mw-geothermal-ppa-with-presidio-texas/

Create a free trial account: Sign Up

Grid monitor is free to try. No credit card required


Already have an account? Login

Upcoming Meetings
PUCT - PUCT Meeting

09/18 - 9:30 AM

ERCOT - OTWG Meeting - Webex Only

09/18 - 9:00 AM

ERCOT - ERCOT CIM 16 Workshop

09/18 - 9:30 AM

ERCOT - PWG Meeting

09/18 - 9:30 AM

Most Active PUCT Filings

APPLICATION OF ONCOR ELECTRIC DELIVERY COMPANY LLC FOR AUTHORITY TO CHANGE RATES - (101 filings)

PROJECT TO DEVELOP COA AND SPCOA STATEWIDE AVERAGE SWITCHED ACCESS RATES FOR NOVEMBER 2025 PUBLICATION UNDER PURA § 52.155 AND 16 TAC § 26.223 - (88 filings)

BROKER REGISTRATIONS - (74 filings)

APPLICATION OF ONCOR ELECTRIC DELIVERY COMPANY LLC TO AMEND ITS CERTIFICATE OF CONVENIENCE AND NECESSITY FOR THE DIVISION 138-KV TRANSMISSION LINE IN TARRANT AND DALLAS COUNTIES - (47 filings)

APPLICATION OF EL PASO ELECTRIC COMPANY FOR AUTHORITY TO CHANGE RATES - (47 filings)

APPLICATION OF ENTERGY TEXAS, INC. TO AMEND ITS CERTIFICATE OF CONVENIENCE AND NECESSITY FOR THE SETEX AREA RELIABILITY PROJECT IN JASPER, MONTGOMERY, NEWTON, POLK, SAN JACINTO, TRINITY, TYLER, AND WALKER COUNTIES - (46 filings)

AGGREGATOR ANNUAL REPORTS - (33 filings)