ERCOT confident power grid will meet summer demand
Baileigh Sheffield | Source: KXXV-TV, Waco, TX | Posted 05/15/2025

As temperatures climb heading into the summer months, the Electric Reliability Council of Texas (ERCOT) says the state’s power grid is expected to handle the anticipated surge in energy demand — due in large part to increased solar power generation.
AI generated summary
The Electric Reliability Council of Texas (ERCOT) is optimistic about the state's power grid's ability to meet the anticipated surge in energy demand this summer, largely due to increased solar power generation. With temperatures rising, ERCOT projects a peak electricity demand of approximately 84,000 megawatts in the coming days, which is a significant increase from last year's peak of 77,000 megawatts in May.
As temperatures across Texas are expected to near triple digits, the demand for air conditioning will likely strain the grid. ERCOT officials are closely monitoring the situation and preparing resources to ensure they can meet the expected demand during this high-use period.
Link to Original Article
Please find the link to the full article below. (Please note that content provider might require a paid subscription)
Source Link: https://www.kxxv.com/news/texas-news/ercot-confident-power-grid-will-meet-summer-demand
05/15 - 9:30 AM
PUCT - Comments Due Project No. 5781905/15 - 3:00 PM
LEGE - Senate Business & Commerce05/15 - 8:00 AM
LEGE - House 89th Legislative Session05/15 - 10:00 AM
05/15/2025
New Alliances: Oil Companies Make the Case for Renewable Energy in Texas05/15/2025
West Texas Town Emerges as AI-Grade Power Hub with 140 MW Battery and Fast-Track Grid Access05/15/2025
Lawmakers spar over IRA credits in budget hearings05/15/2025
Amid record demand rise, efficiency and demand response can lower Texas power bills: Aurora05/15/2025
The country’s biggest grid operator has a new tool to track emissionsAPPLICATION OF ENTERGY TEXAS, INC. TO AMEND ITS CERTIFICATE OF CONVENIENCE AND NECESSITY FOR THE SETEX AREA RELIABILITY PROJECT IN JASPER, MONTGOMERY, NEWTON, POLK, SAN JACINTO, TRINITY, TYLER, AND WALKER COUNTIES - (199 filings)
APPLICATION OF EL PASO ELECTRIC COMPANY FOR AUTHORITY TO CHANGE RATES - (120 filings)
CY 2025 RETAIL PERFORMANCE MEASURE REPORTS PURSUANT TO 16 TAC 25.88 - (103 filings)
BROKER REGISTRATIONS - (90 filings)
APPLICATION OF CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC FOR APPROVAL OF ITS 2026-2028 TRANSMISSION AND DISTRIBUTION SYSTEM RESILIENCY PLAN - (79 filings)
CY 2024 ANNUAL POWER LINE INSPECTION & SAFETY REPORT IN PURSUANT TO 16 TAC § 25.97(F) - (64 filings)
PROJECT TO SUBMIT EMERGENCY OPERATIONS PLANS AND RELATED DOCUMENTS UNDER 16 TAC § 25.53 - (62 filings)