Texas PUC Drafting Reliability Exemption Rule for ERCOT

Tom Kleckner | Source: RTO Insider | Posted 05/15/2025

Related controls:
Keyword Tags:

Texas Public Utility Commission staff are drafting a rule to codify a process for exemption requests from ERCOT reliability requirements and allow owners of generation, load or energy storage resources to appeal the grid operator’s decisions to the PUC (57374).


AI generated summary

The Texas Public Utility Commission (PUC) is in the process of drafting a rule that will establish a formal procedure for market participants to request exemptions from ERCOT's reliability requirements. This initiative follows the approval of a change to ERCOT's Nodal Operating Guide, which introduced new voltage ride-through requirements for inverter-based resources. The proposed rule aims to facilitate appeals to the PUC regarding ERCOT's decisions, while ensuring that existing exemptions and unrelated protocols remain unaffected.

Additionally, the PUC's Division of Compliance and Enforcement is addressing around 130 violation findings related to entities that have failed to submit their emergency operations plans (EOPs) or annual updates. Following a directive to investigate non-compliant entities, DICE has identified a number of companies that have met compliance deadlines, and most cases have been resolved through corrective action plans. The focus remains on ensuring reliability over cost considerations in the evaluation of exemption requests.



Link to Original Article

Please find the link to the full article below. (Please note that content provider might require a paid subscription)


Source Link: https://www.rtoinsider.com/105234-puc-drafting-reliability-exemption-rule-ercot/

Create a free trial account: Sign Up

Grid monitor is free to try. No credit card required


Already have an account? Login

Most Active PUCT Filings

APPLICATION OF ENTERGY TEXAS, INC. TO AMEND ITS CERTIFICATE OF CONVENIENCE AND NECESSITY FOR THE SETEX AREA RELIABILITY PROJECT IN JASPER, MONTGOMERY, NEWTON, POLK, SAN JACINTO, TRINITY, TYLER, AND WALKER COUNTIES - (199 filings)

APPLICATION OF EL PASO ELECTRIC COMPANY FOR AUTHORITY TO CHANGE RATES - (122 filings)

CY 2025 RETAIL PERFORMANCE MEASURE REPORTS PURSUANT TO 16 TAC 25.88 - (106 filings)

BROKER REGISTRATIONS - (90 filings)

APPLICATION OF CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC FOR APPROVAL OF ITS 2026-2028 TRANSMISSION AND DISTRIBUTION SYSTEM RESILIENCY PLAN - (79 filings)

CY 2024 ANNUAL POWER LINE INSPECTION & SAFETY REPORT IN PURSUANT TO 16 TAC § 25.97(F) - (64 filings)

PROJECT TO SUBMIT EMERGENCY OPERATIONS PLANS AND RELATED DOCUMENTS UNDER 16 TAC § 25.53 - (62 filings)