Is Texas prepared for massive, quick frequency deviations?

DOUG LEWIN | Source: Doug Lewin | Posted 05/01/2025

Keyword Tags:

More than a decade ago, ERCOT convened the Future Ancillary Services Team (FAST) to prepare for the kind of incident that hit Spain this week (I’ve been doing this long enough that I participated in some of those meetings). That effort led to a new fast-responding backup reserve program that helps ERCOT deal with rapid frequency shifts.


AI generated summary

The article discusses Texas's preparedness for rapid frequency deviations in its power grid, particularly in light of a recent incident in Spain. It highlights the proactive measures taken by ERCOT, including the establishment of the Future Ancillary Services Team (FAST) and the implementation of a Fast Frequency Regulation (FFR) program, which allows for rapid response to frequency fluctuations. Texas boasts a significant advantage over Spain with its extensive battery energy storage systems, enabling quicker responses to grid disturbances.

Furthermore, the article emphasizes the importance of a comprehensive approach to grid management, termed 'Defense-in-Depth,' which encompasses various ancillary services to address multiple risks. It stresses the need for continuous improvement and adaptation in response to new energy sources and potential challenges. The author advocates for the expansion of fast-acting resources, particularly batteries, to enhance grid reliability and support Texas's leadership in renewable energy while ensuring affordability and stability.



Link to Original Article

Please find the link to the full article below. (Please note that content provider might require a paid subscription)


Source Link: https://www.douglewin.com/p/besst-in-class

Create a free trial account: Sign Up

Grid monitor is free to try. No credit card required


Already have an account? Login

Most Active PUCT Filings

APPLICATION OF ENTERGY TEXAS, INC. TO AMEND ITS CERTIFICATE OF CONVENIENCE AND NECESSITY FOR THE SETEX AREA RELIABILITY PROJECT IN JASPER, MONTGOMERY, NEWTON, POLK, SAN JACINTO, TRINITY, TYLER, AND WALKER COUNTIES - (316 filings)

CY 2024 ANNUAL POWER LINE INSPECTION & SAFETY REPORT IN PURSUANT TO 16 TAC § 25.97(F) - (89 filings)

APPLICATION OF CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC FOR APPROVAL OF ITS 2026-2028 TRANSMISSION AND DISTRIBUTION SYSTEM RESILIENCY PLAN - (84 filings)

APPLICATION OF EL PASO ELECTRIC COMPANY FOR AUTHORITY TO CHANGE RATES - (81 filings)

BROKER REGISTRATIONS - (73 filings)

PROJECT TO SUBMIT EMERGENCY OPERATIONS PLANS AND RELATED DOCUMENTS UNDER 16 TAC § 25.53 - (71 filings)

APPLICATION OF ENTERGY TEXAS, INC. TO AMEND ITS CERTIFICATE OF CONVENIENCE AND NECESSITY TO CONSTRUCT A PORTFOLIO OF DISPATCHABLE GENERATION RESOURCES - (57 filings)