More Solar and Battery Storage Were Added to Texas’ Grid Than Any Other Power Source Last Year
Arcelia Martin | Source: Inside Climate News | Posted 03/15/2025

Texas has become one of the nation’s frontrunners in developing renewable energy. In recent years, the state’s reign came from wind power coupled with utility-scale solar.
AI generated summary
In Texas, the electric grid is experiencing a significant shift towards renewable energy, with solar and battery storage leading the way in capacity growth. According to a report from the Federal Reserve Bank of Dallas, Texas added nearly 1,500 megawatts of battery storage in 2023, which surged to 4,374 megawatts in 2024. Similarly, solar power capacity increased from 4,570 megawatts in 2023 to almost 9,700 megawatts in 2024, highlighting the state's commitment to diversifying its energy sources beyond the historically dominant natural gas.
The Electricity Reliability Council of Texas (ERCOT) manages the majority of the state's energy and has seen a notable increase in renewable contributions, particularly from solar and battery storage. With the demand for power rising due to population growth and heavy energy users, ERCOT is adapting by enhancing its forecasting capabilities and considering upgrades to its transmission system. The anticipated growth in renewable energy capacity is expected to require significant public investment to ensure reliability and efficiency in meeting future energy demands.
Link to Original Article
Please find the link to the full article below. (Please note that content provider might require a paid subscription)
Source Link: https://insideclimatenews.org/news/10022025/solar-battery-storage-texas-grid/
05/23 - 7:00 AM
LEGE - Senate Business & Commerce05/23 - 8:00 AM
LEGE - House 89th Legislative Session05/23 - 10:00 AM
LEGE - Senate Session05/23 - 11:00 AM
05/23/2025
House passes more bruising budget bill for solar industry05/23/2025
Nuclear industry ‘facing some headwinds’ amid congressional budget fight: NEI CEO05/23/2025
Solar energy on the rise in America05/23/2025
Soluna unveils its 1st solar-powered data centre project in Texas05/23/2025
FERC Staff Releases 2025 Summer Energy Market and Electric Reliability AssessmentAPPLICATION OF ENTERGY TEXAS, INC. TO AMEND ITS CERTIFICATE OF CONVENIENCE AND NECESSITY FOR THE SETEX AREA RELIABILITY PROJECT IN JASPER, MONTGOMERY, NEWTON, POLK, SAN JACINTO, TRINITY, TYLER, AND WALKER COUNTIES - (192 filings)
APPLICATION OF EL PASO ELECTRIC COMPANY FOR AUTHORITY TO CHANGE RATES - (125 filings)
CY 2025 RETAIL PERFORMANCE MEASURE REPORTS PURSUANT TO 16 TAC 25.88 - (121 filings)
BROKER REGISTRATIONS - (89 filings)
APPLICATION OF CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC FOR APPROVAL OF ITS 2026-2028 TRANSMISSION AND DISTRIBUTION SYSTEM RESILIENCY PLAN - (66 filings)
PROJECT TO SUBMIT EMERGENCY OPERATIONS PLANS AND RELATED DOCUMENTS UNDER 16 TAC § 25.53 - (57 filings)
CY 2024 ANNUAL POWER LINE INSPECTION & SAFETY REPORT IN PURSUANT TO 16 TAC § 25.97(F) - (50 filings)