Texas regulators receive system resiliency plan from Xcel Energy

Kim Riley | Source: Daily Energy Insider | Posted 02/08/2025

Keyword Tags:

Xcel Energy filed its initial system resiliency plan with the Public Utility Commission of Texas (PUCT) Dec. 31 to ensure its power systems are more resilient against extreme weather and wildfires.


AI generated summary

Xcel Energy has submitted a system resiliency plan to the Public Utility Commission of Texas aimed at enhancing the reliability of its power systems against extreme weather and wildfires. The plan, which targets the Texas Panhandle and South Plains region, includes a proposed investment of approximately $539 million over three years to upgrade the electric grid. Key improvements will involve reinforcing infrastructure, upgrading protection systems, and expanding automation to ensure reliable electricity for around 280,000 homes and businesses while minimizing power outages and costs associated with storm recovery.

To further strengthen the grid against wildfires, Xcel Energy plans to implement enhanced inspections, vegetation management, and the installation of weather stations and advanced detection technologies. The company aims to create a more modern and flexible energy system capable of quickly addressing issues as they arise, thereby improving safety and reliability. With the increasing frequency of severe weather events, Xcel Energy emphasizes the importance of a robust electric grid to meet future demands and maintain service continuity.



Link to Original Article

Please find the link to the full article below. (Please note that content provider might require a paid subscription)


Source Link: https://dailyenergyinsider.com/news/46764-texas-regulators-receive-system-resiliency-plan-from-xcel-energy/

Create a free trial account: Sign Up

Grid monitor is free to try. No credit card required


Already have an account? Login

Most Active PUCT Filings

CY 2025 ELECTRIC GENERATING CAPACITY REPORTS IN PURSUANT TO 16 TAC §25.91 - (413 filings)

PROJECT TO SUBMIT EMERGENCY OPERATIONS PLANS AND RELATED DOCUMENTS UNDER 16 TAC § 25.53 - (371 filings)

Renewal of Registration for Power Generation Companies (PGCS) and Self-Generators (SGS) (Odd Numbered Registration) Under 16 TAC §25.109 (H) – 2025 - (236 filings)

APPLICATION OF ENTERGY TEXAS, INC. TO AMEND ITS CERTIFICATE OF CONVENIENCE AND NECESSITY FOR THE SETEX AREA RELIABILITY PROJECT IN JASPER, MONTGOMERY, NEWTON, POLK, SAN JACINTO, TRINITY, TYLER, AND WALKER COUNTIES - (136 filings)

CY 2024 RETAIL PERFORMANCE MEASURE REPORTS PURSUANT TO 16 TAC 25.88 - (110 filings)

CY 2024 RETAIL ELECTRIC PROVIDER (REP) ANNUAL REPORTS AND CY 2025 REP SEMI-ANNUAL REPORTS PURSUANT TO 16 TAC 25.107(I) - (104 filings)

APPLICATION OF BRAZOS ELECTRIC POWER COOPERATIVE, INC. TO AMEND ITS CERTIFICATE OF CONVENIENCE AND NECESSITY FOR THE BEECHAM GAP 138-KV TRANSMISSION LINE IN LAMPASAS AND CORYELL COUNTIES - (99 filings)