Meeting Summary - 01/24/2025 SAWG Meeting

Grid Monitor AI | Posted 01/24/2025

Keyword Tags:

▶️1 - Antitrust Admonition - Kevin Hanson

  • Discussion on antitrust admonition and guidelines for ERCOT activities.
  • Presentations scheduled from Sean Siddiqui, Katie Rich, and Gordon Drake.
  • Presentation on the SERVM simulation projects for 2025.
  • Discussion on SAWG leadership for the current year.

▶️2 - DRRS Market Design Proposal Discussion - Andrew Ramirez

Offline DRRS

HEN Strawman for DRRS

DRRS Review Feedback & Next Steps

  • Proposal for ERCOT to allow co-optimization of DRRS in real-time.
  • Main issue identified with offline DRRS related to disconnect between SCED and RUC.
  • Suggestion to use a shorter version of RUC that could run more quickly around 5 minutes.
  • Recommendation to prioritize committing DRRS units over non-DRRS units.
  • DRRS co-optimization expected to improve price formation.
  • Proposal includes shortening the study period to 4-5 hours.
  • Discussion on operational changes and implications for RUC process at ERCOT.
  • Concerns about the 2-hour start time criteria for DRRS and potential impact on pricing and deployment.
  • Suggesting a possible reduction in start time to 60 minutes for offline reserves.
  • ERCOT's operations reluctance towards proposed changes emphasizing need for broader input.

▶️3 - CDR Preparation Update

CDR Preparation Update

  • The CDR is targeted for release in mid-February, with an exact date to be announced via a market notice.
  • New CDR will include scenarios for both peak load and net peak load views, covering summer and winter seasons.
  • The CDR will feature a revamped unit detail table and new tabs including installed capacity by resource type and wind/solar county mappings.
  • A new 'findings and discussions' tab will replace the previous executive summary, providing more detailed information and graphics.
  • A decommissioned resource report will replace the old decommission generator resources tab, offering more frequent updates.
  • The unconfirmed planned retirements and fossil fuel capacities will be addressed via a new NPRR to capture their capacity contributions.
  • The unit details tab will include new columns for CDR status and CDR resource attributes, providing codes for different operational statuses and resource types.
  • In service dates will now indicate the exact day to enhance data analysis capabilities.
  • CDR will integrate seasonal reporting sections, adding spring and fall in future reports.
  • Operational capacities will include most resources, except indefinitely mothballed units.

▶️4 - SERVM Simulation-related Projects for 2025

SERVM Projects for 2025

  • Projects focus on weather event modeling with emphasis on January events and event durations.
  • Zonal reliability model development to convert the system to a multi-zonal model.
  • Reliability standard assessment prototyping and the importance of supply deliverability analysis.
  • Effective Load Carrying Capability (ELCC) assessments, focusing on risk periods and potential solar penetration levels.
  • Trial simulations for 2026 to set up models and understand reliability assessment challenges.
  • Discussion on handling sensitive data related to generation mapping and zonal analysis implications.
  • Discussion on the effectiveness and expansion of zonal models on reserve margins and deliverability constraints.
  • Initiative to develop and refine models and assumptions documents ahead of deadlines.
  • Probabilistic assessments for NERC's annual reliability reports now conducted every year.

▶️5 - SAWG Leadership

  • Current Chair wishes to continue leading for 2025.
  • Greg Lackey is expected to continue as Vice Chair.
  • Open call for other nominations for Chair or Vice Chair positions.
  • No new nominations received; current leaders will likely continue.
  • Chair confirms new employment with Invenergy since three weeks ago.

▶️6 - Other Business

  • Confirmation of no additional business items to discuss.
  • No further comments or questions from participants.

▶️7 - Adjourn

Create a free trial account: Sign Up

Grid monitor is free to try. No credit card required


Already have an account? Login

Most Active PUCT Filings

CY 2025 RETAIL PERFORMANCE MEASURE REPORTS PURSUANT TO 16 TAC 25.88 - (135 filings)

APPLICATION OF EL PASO ELECTRIC COMPANY FOR AUTHORITY TO CHANGE RATES - (129 filings)

APPLICATION OF ONCOR ELECTRIC DELIVERY COMPANY LLC FOR AUTHORITY TO CHANGE RATES - (121 filings)

CY 2024 RETAIL ELECTRIC PROVIDER (REP) ANNUAL REPORTS AND CY 2025 REP SEMI-ANNUAL REPORTS PURSUANT TO 16 TAC 25.107(I) - (107 filings)

BROKER REGISTRATIONS - (76 filings)

APPLICATION OF ENTERGY TEXAS, INC. TO AMEND ITS CERTIFICATE OF CONVENIENCE AND NECESSITY FOR THE CYPRESS-TO-LEGEND 500-KV TRANSMISSION LINE IN HARDIN AND JEFFERSON COUNTIES - (55 filings)

APPLICATION OF ONCOR ELECTRIC DELIVERY COMPANY LLC TO AMEND ITS CERTIFICATE OF CONVENIENCE AND NECESSITY FOR THE BORDER SWITCH-TO-CLEARFORK SWITCH 345-KV TRANSMISSION LINE IN ANDREWS, ECTOR, LOVING, AND WINKLER COUNTIES - (36 filings)