Meeting Summary - 01/24/2025 SAWG Meeting
Grid Monitor AI | Posted 01/24/2025

▶️1 - Antitrust Admonition - Kevin Hanson
- Discussion on antitrust admonition and guidelines for ERCOT activities.
- Presentations scheduled from Sean Siddiqui, Katie Rich, and Gordon Drake.
- Presentation on the SERVM simulation projects for 2025.
- Discussion on SAWG leadership for the current year.
▶️2 - DRRS Market Design Proposal Discussion - Andrew Ramirez
DRRS Review Feedback & Next Steps
- Proposal for ERCOT to allow co-optimization of DRRS in real-time.
- Main issue identified with offline DRRS related to disconnect between SCED and RUC.
- Suggestion to use a shorter version of RUC that could run more quickly around 5 minutes.
- Recommendation to prioritize committing DRRS units over non-DRRS units.
- DRRS co-optimization expected to improve price formation.
- Proposal includes shortening the study period to 4-5 hours.
- Discussion on operational changes and implications for RUC process at ERCOT.
- Concerns about the 2-hour start time criteria for DRRS and potential impact on pricing and deployment.
- Suggesting a possible reduction in start time to 60 minutes for offline reserves.
- ERCOT's operations reluctance towards proposed changes emphasizing need for broader input.
▶️3 - CDR Preparation Update
- The CDR is targeted for release in mid-February, with an exact date to be announced via a market notice.
- New CDR will include scenarios for both peak load and net peak load views, covering summer and winter seasons.
- The CDR will feature a revamped unit detail table and new tabs including installed capacity by resource type and wind/solar county mappings.
- A new 'findings and discussions' tab will replace the previous executive summary, providing more detailed information and graphics.
- A decommissioned resource report will replace the old decommission generator resources tab, offering more frequent updates.
- The unconfirmed planned retirements and fossil fuel capacities will be addressed via a new NPRR to capture their capacity contributions.
- The unit details tab will include new columns for CDR status and CDR resource attributes, providing codes for different operational statuses and resource types.
- In service dates will now indicate the exact day to enhance data analysis capabilities.
- CDR will integrate seasonal reporting sections, adding spring and fall in future reports.
- Operational capacities will include most resources, except indefinitely mothballed units.
▶️4 - SERVM Simulation-related Projects for 2025
- Projects focus on weather event modeling with emphasis on January events and event durations.
- Zonal reliability model development to convert the system to a multi-zonal model.
- Reliability standard assessment prototyping and the importance of supply deliverability analysis.
- Effective Load Carrying Capability (ELCC) assessments, focusing on risk periods and potential solar penetration levels.
- Trial simulations for 2026 to set up models and understand reliability assessment challenges.
- Discussion on handling sensitive data related to generation mapping and zonal analysis implications.
- Discussion on the effectiveness and expansion of zonal models on reserve margins and deliverability constraints.
- Initiative to develop and refine models and assumptions documents ahead of deadlines.
- Probabilistic assessments for NERC's annual reliability reports now conducted every year.
▶️5 - SAWG Leadership
- Current Chair wishes to continue leading for 2025.
- Greg Lackey is expected to continue as Vice Chair.
- Open call for other nominations for Chair or Vice Chair positions.
- No new nominations received; current leaders will likely continue.
- Chair confirms new employment with Invenergy since three weeks ago.
▶️6 - Other Business
- Confirmation of no additional business items to discuss.
- No further comments or questions from participants.
▶️7 - Adjourn
08/25 - 12:00 PM
ERCOT - RTCB Market Trials Weekly Webex08/25 - 10:00 AM
ERCOT - Initiative Prioritization Workshop08/25 - 12:30 PM
ERCOT - Initiative Prioritization Workshop08/26 - 12:30 AM
08/25/2025
08/25/2025 RTCB Market Trials Weekly Webex08/25/2025
100,000 applicants and 5,000 spots: Record number of Houstonians need help paying their utility bills08/25/2025
Fluence starts production of battery system components in Texas08/25/2025
Why Forward-Looking Data Center Operators Are Taking Control of Their Own Grids08/25/2025
Texas grid strain forces ERCOT to consider industrial power shutoffsCY 2025 RETAIL PERFORMANCE MEASURE REPORTS PURSUANT TO 16 TAC 25.88 - (135 filings)
APPLICATION OF EL PASO ELECTRIC COMPANY FOR AUTHORITY TO CHANGE RATES - (129 filings)
APPLICATION OF ONCOR ELECTRIC DELIVERY COMPANY LLC FOR AUTHORITY TO CHANGE RATES - (121 filings)
CY 2024 RETAIL ELECTRIC PROVIDER (REP) ANNUAL REPORTS AND CY 2025 REP SEMI-ANNUAL REPORTS PURSUANT TO 16 TAC 25.107(I) - (107 filings)
BROKER REGISTRATIONS - (76 filings)
APPLICATION OF ENTERGY TEXAS, INC. TO AMEND ITS CERTIFICATE OF CONVENIENCE AND NECESSITY FOR THE CYPRESS-TO-LEGEND 500-KV TRANSMISSION LINE IN HARDIN AND JEFFERSON COUNTIES - (55 filings)
APPLICATION OF ONCOR ELECTRIC DELIVERY COMPANY LLC TO AMEND ITS CERTIFICATE OF CONVENIENCE AND NECESSITY FOR THE BORDER SWITCH-TO-CLEARFORK SWITCH 345-KV TRANSMISSION LINE IN ANDREWS, ECTOR, LOVING, AND WINKLER COUNTIES - (36 filings)