Eni Plenitude completes construction of 200MW/400MWh Texas BESS

April Bonner | Source: Energy Storage News | Posted 01/15/2025

Keyword Tags:

Eni New Energy US has been building a notable solar PV portfolio in the US, recently acquiring 272MWac of under-construction solar projects and in 2022, the 81MW Kellam PV plant in North Texas.  


AI generated summary

Eni Plenitude, the utility arm of Eni, has finished building the 200MW/400MWh Guajillo Battery Energy Storage System (BESS) project in Texas, US, through its subsidiary, Eni New Energy US. The project, using lithium iron phosphate battery cells, is located next to the Corazon Solar Farm and is set to be operational by mid-2025.

Eni New Energy US has been actively expanding its solar PV portfolio in the US, acquiring under-construction solar projects and the Kellam PV plant in Texas. The completion of the Guajillo project further cements Eni's presence in the US renewable energy market, where it now boasts 1.5 GW of installed capacity. Patrick Monino, the head of Plenitude Renewables North America, emphasized the importance of large lithium-ion batteries in enabling the integration of renewable energies into electrical systems.



Link to Original Article

Please find the link to the full article below. (Please note that content provider might require a paid subscription)


Source Link: https://www.energy-storage.news/eni-plenitude-constructs-200mw-400mwh-texas-bess/

Create a free trial account: Sign Up

Grid monitor is free to try. No credit card required


Already have an account? Login

Upcoming Meetings
Most Active PUCT Filings

APPLICATION OF ENTERGY TEXAS, INC. TO AMEND ITS CERTIFICATE OF CONVENIENCE AND NECESSITY FOR THE SETEX AREA RELIABILITY PROJECT IN JASPER, MONTGOMERY, NEWTON, POLK, SAN JACINTO, TRINITY, TYLER, AND WALKER COUNTIES - (283 filings)

APPLICATION OF CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC FOR APPROVAL OF ITS 2026-2028 TRANSMISSION AND DISTRIBUTION SYSTEM RESILIENCY PLAN - (85 filings)

CY 2024 ANNUAL POWER LINE INSPECTION & SAFETY REPORT IN PURSUANT TO 16 TAC § 25.97(F) - (79 filings)

APPLICATION OF EL PASO ELECTRIC COMPANY FOR AUTHORITY TO CHANGE RATES - (76 filings)

BROKER REGISTRATIONS - (67 filings)

APPLICATION OF ENTERGY TEXAS, INC. TO AMEND ITS CERTIFICATE OF CONVENIENCE AND NECESSITY TO CONSTRUCT A PORTFOLIO OF DISPATCHABLE GENERATION RESOURCES - (59 filings)

APPLICATION OF CROSS TEXAS TRANSMISSION, LLC FOR AUTHORITY TO CHANGE RATES AND TARIFFS - (55 filings)