<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">August 1 2024 ROS meeting minutes added to combo ballot.</span></li>
</ul>
<p><a href="/sharing/?token=81f2ac80-9a80-4d9f-814b-0be0446e22cd"><span style="font-weight: 400;">4</span></a><span style="font-weight: 400;"> - Technical Advisory Committee - TAC Update - Katie Rich</span></p>
<ul>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">TAC approved NOGRR262 related to NPRR1220 and NPRR1121.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Stakeholder process discussion for TAC moved to the September 19 meeting.</span></li>
</ul>
<p><a href="/sharing/?token=b3b3ee9d-382f-4d83-9e3e-4d914667c06b"><span style="font-weight: 400;">5</span></a><span style="font-weight: 400;"> - ERCOT Reports</span></p>
<p><a href="/sharing/?token=cca82bce-34f6-48e3-a5f4-568e660e9785"><span style="font-weight: 400;">5.1</span></a><span style="font-weight: 400;"> - Operations </span><a href="https://ercot-control-docs.s3.us-west-2.amazonaws.com/03/july-2024-ercot-operations-report-public.docx"><span style="font-weight: 400;">Report</span></a><span style="font-weight: 400;"> - Alex Lee</span></p>
<ul>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Low demand in July compared to previous July.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Peak demand: 81,010 MW on July 1.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Previous year's July peak demand: 82,964 MW.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Solar generation record: 20,484 MW on July 31.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Two frequency events due to generator trips.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">One frequency event led to deployment of ECRS.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">No RRS deployments in July.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">One DC tide curtailment due to forced outage.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Three HRUC commitments, all due to congestion.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Hurricane Beryl made landfall in Texas.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">OCN operating condition notice, advisory watch, and emergency notice issued for hurricane.</span></li>
</ul>
<p><a href="/sharing/?token=187c6137-9c3c-4bcf-adf5-be07de31fdcf"><span style="font-weight: 400;">5.2</span></a><span style="font-weight: 400;"> - System Planning </span><a href="https://ercot-control-docs.s3.us-west-2.amazonaws.com/14/systemplanningros_july2024.docx"><span style="font-weight: 400;">Report</span></a><span style="font-weight: 400;"> - Ping Yan</span></p>
<ul>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">ERCOT will hold a workshop for HV 765 kV vendors on September 18 at Med Center.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">More information available on the ERCOT website.</span></li>
</ul>
<p><a href="/sharing/?token=c6b45c77-0e0a-4e47-a4b3-1cb7aeb40aa6"><span style="font-weight: 400;">5.3</span></a><span style="font-weight: 400;"> - 2024 Annual Under-Frequency Load Shed - UFLS - </span><a href="https://ercot-control-docs.s3.us-west-2.amazonaws.com/30/05-2024-ercot-ufls-survey-results.pptx"><span style="font-weight: 400;">Survey Results</span></a><span style="font-weight: 400;"> - Jake Pedigo</span></p>
<p><strong>Background:</strong></p>
<ul>
<li style="font-weight: 400;" aria-level="1"><strong>Purpose:</strong><span style="font-weight: 400;"> Ensure the required automatic under frequency load shed circuits provide appropriate load relief.</span></li>
<li style="font-weight: 400;" aria-level="1"><strong>Reference:</strong><span style="font-weight: 400;"> ERCOT nodal operating guides, Section 2.6.1 (1)</span></li>
</ul>
<p><strong>Survey Results:</strong></p>
<ul>
<li style="font-weight: 400;" aria-level="1"><strong>Overall Results:</strong><span style="font-weight: 400;"> All UFLS stages were satisfied. 2024 observed load: 55,616 MW. 2023 result: 30.95% at 52,679 MW of load.</span></li>
<li style="font-weight: 400;" aria-level="1"><strong>Revisions:</strong>
<ul>
<li style="font-weight: 400;" aria-level="3"><strong>Changes:</strong><span style="font-weight: 400;"> Increases load shed stages from three to five and adds a minimum time delay of six cycles.</span></li>
<li style="font-weight: 400;" aria-level="3"><strong>Status:</strong><span style="font-weight: 400;"> Supplemental UFLS stages implementation is allowed but not required; two entities have started implementation.</span></li>
</ul>
<ul>
<li style="font-weight: 400;" aria-level="3"><strong>Changes:</strong><span style="font-weight: 400;"> Allows anti-stall UFLS stages, required no earlier than October 1, 2026.</span></li>
<li style="font-weight: 400;" aria-level="3"><strong>Status:</strong> Two TO entities have started implementation affecting the survey percentage marginally.</li>
</ul>
</li>
<ul>
<li style="font-weight: 400;" aria-level="2"><strong>NOGRR247:</strong></li>
<li style="font-weight: 400;" aria-level="2"><strong>NOGRR226:</strong></li>
</ul>
</ul>
<p><a href="/sharing/?token=d75771dd-e363-419c-a686-87f2be7a028c"><span style="font-weight: 400;">5.4</span></a><span style="font-weight: 400;"> - Generic Transmission Constraint </span><a href="https://ercot-control-docs.s3.us-west-2.amazonaws.com/30/05-gtcupdate_ros_sep2024.pdf"><span style="font-weight: 400;">GTC Update</span></a><span style="font-weight: 400;"> - Yunzhi Cheng</span></p>
<ul>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Recent Panhandle GTC update based on Q2 2024 QSA study, with no interface definition changes.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Panhandle GDL under no priority and with priority conditions based on nearby panhandle IBRs including wind and shoulder dispatch at 90%.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Previous discussion on assumptions for Panhandle GTC limits.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Before update, Panhandle TDL under no priority condition was based on nearby panhandle wind solar dispatch 90%. For priority conditions, it was 100%.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Current GTC update standardizes conditions to 90% wind and solar dispatch for both priority and non-priority conditions.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">GTC update became effective on August 1.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Detailed info available on ERCOT's IMIS system.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Large load impact on McKamey GTC discussed.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Seven operational large loads within McKamey GTC area, all connected to 130 kV system totaling 480 megawatts.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Study used composite load model by TSPs, including motor and electronic components.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Composite model: motors account for 10% and electronic components for 90% of load.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Assumption that electronic component will trip with no reconnection if voltage drops below 0.75 per unit.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Observed material impact of large load on GTC limit, reducing it by 200 megawatts under certain conditions.</span></li>
</ul>
<p><a href="/sharing/?token=28c04cb5-10e5-42d0-9cfa-f9ab5a93ff75"><span style="font-weight: 400;">5.5</span></a><span style="font-weight: 400;"> - Outage Coordination for Private Use Network - PUN Resource Planned Outages </span><a href="https://ercot-control-docs.s3.us-west-2.amazonaws.com/03/5-outage-coordiantion-for-pun-and-igf-september-ros-2024.pptx"><span style="font-weight: 400;">Update</span></a><span style="font-weight: 400;"> - ERCOT Staff</span></p>
<ul>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Provided a high-level status update following the August report to ROS.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Summarized challenges in outage coordination due to NPRR945</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Highlighted proposed solutions with no impact to registration but updates to internal models and processes.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Aiming to recognize industrial generation facilities (IGF) related to PUNs for better outage coordination.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Implementing a new native network model within internal applications, expected to complete by end of September.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Developing processes to work with existing and new registrar PUNs for proper IGF identification.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Tool implementation expected by September end; additional steps required through October and end of the year.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Addressed a question from Steve Reedy about identifying and handling PUN loads in Load Distribution Factors (LDFs).</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Confirmed no change to the formal registration process, but possibly additional internal recognition for IGFs.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Will follow up on specific details regarding LDF treatment and provide updates next month.</span></li>
</ul>
<p><a href="/sharing/?token=f28d714c-1bb9-49f6-b668-1a7e68226b9b"><span style="font-weight: 400;">5.6</span></a><span style="font-weight: 400;"> - Proposed Changes to Ancillary Service Methodology for 2025 - Vote - Luis Hinojosa</span></p>
<h4><strong>Key Discussions:</strong></h4>
<ul>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Introduction of </span><a href="https://ercot-control-docs.s3.us-west-2.amazonaws.com/06/5-2025_as_methodology_sep_ros-v2.zip"><span style="font-weight: 400;">proposed changes</span></a><span style="font-weight: 400;"> to the 2025 Ancillary Services (AS) methodology.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Review and recap of previous discussions and slide presentations shared with working groups.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Main changes highlighted for various services:</span>
<ul>
<li style="font-weight: 400;" aria-level="3"><span style="font-weight: 400;">Removal of 90th percentile coverage during sunset hours.</span></li>
<li style="font-weight: 400;" aria-level="3"><span style="font-weight: 400;">Frequency recovery portion set to 70th percentile of historic net load and inertia.</span></li>
<li style="font-weight: 400;" aria-level="3"><span style="font-weight: 400;">New calculation method for required capacity takes the maximum of either frequency recovery or net load forecast error calculations.</span></li>
<li style="font-weight: 400;" aria-level="2"><span style="font-weight: 400;">Regulation Service: Switching to use net load forecast errors rather than net load ramping.</span></li>
<li style="font-weight: 400;" aria-level="2"><span style="font-weight: 400;">ECRS:</span>
<ul>
<li style="font-weight: 400;" aria-level="2"><span style="font-weight: 400;">Non-Spin Requirement: Using a four-hour ahead net load forecast error instead of six-hour during off-peak hours (23 to 6).</span></li>
<li style="font-weight: 400;" aria-level="2"><span style="font-weight: 400;">No changes to RRS methodology; IFRO change noted from 1185 to 1365 for 2025.</span></li>
</ul>
</li>
</ul>
</li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Clarification of adjustments to ECRS quantities and posting of updated slides.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Presentation of impacts of the proposed changes on monthly average quantities for Regulation Up, Regulation Down, ECRS, and Non-Spin services.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Detailed discussion on reduced ECRS quantities and changes calculation methodology.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Questions and concerns raised by attendees regarding:</span>
<ul>
<li style="font-weight: 400;" aria-level="2"><span style="font-weight: 400;">IMM recommendations and their incorporation into the process.</span></li>
<li style="font-weight: 400;" aria-level="2"><span style="font-weight: 400;">Potential reliance on RUCs due to reduced procurement of ancillary services.</span></li>
<li style="font-weight: 400;" aria-level="2"><span style="font-weight: 400;">Details on ERCOT's analysis leading to proposed ECRS changes.</span></li>
</ul>
</li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Decision to seek endorsement from ROS for the 2025 AS methodology.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Votes taken with a summary of motions and results.</span></li>
</ul>
<ul>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Motion To endorse proposed changes to the Ancillary Service Methodology for 2025 as recommended by ERCOT Staff </span></li>
</ul>
<p><img src="/storage/docs/2024/09/AS%20ROS%20Ballot.png" width="572" height="548" /></p>
<p><a href="/sharing/?token=32bafc3d-aea4-454b-80f9-6e218a69c4b0"><span style="font-weight: 400;">6</span></a><span style="font-weight: 400;"> - ROS Revision Requests - Vote - Katie Rich</span></p>
<ul>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Two items for IA review.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Both items have no impact.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Items are NOGRR263 and NOGRR264.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">NOGRR263 and NOGRR264 are related to NPRR1235, the DRS standalone product.</span></li>
</ul>
<p><a href="/sharing/?token=d2181ccc-4af5-41ad-92a3-529ee5a611e5"><span style="font-weight: 400;">6.2</span></a><span style="font-weight: 400;"> - NOGRR263, Clarification of Controllable Load Resource Primary Frequency Response Responsibilities</span></p>
<ul>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Jordan Schofield proposed a slight revision to NOGRR263, primarily a clerical change.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">NOGRR263 was introduced three months before NPRR1244 and initially stood alone.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">With the impact analysis publication, it is clear NPRR1244 holds the significant changes.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">The proposal is to switch the 'related to' label from NPRR1244 to NOGRR263 to direct attention to NPRR1244 for full project impacts.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">There was consensus to move forward with the combined impact analysis for both NOGRRs.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Motion to endorse and forward to TAC the 8/1/24 ROS Report as revised by ROS and the 9/6/24 Impact Analysis added to the combo ballot.</span></li>
</ul>
<p><a href="/sharing/?token=bb78d0c8-3075-41c7-9912-3c9a0505dc60"><span style="font-weight: 400;">6.3</span></a><span style="font-weight: 400;"> - NOGRR264, Related to NPRR1235, Dispatchable Reliability Reserve Service as a Stand-Alone Ancillary Service</span></p>
<ul>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Motion to endorse and forward to TAC the 8/1/24 ROS Report and 5/29/24 Impact Analysis added to the combo ballot.</span></li>
</ul>
<p><a href="/sharing/?token=d025600f-613f-4710-b6d4-4df14c29ac64"><span style="font-weight: 400;">6.4</span></a><span style="font-weight: 400;"> - NOGRR268, Related to NPRR1246, Energy Storage Resource Terminology Alignment for the Single-Model Era</span></p>
<ul>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Motion to table NOGRR268 added to the combo ballot.</span></li>
</ul>
<p><a href="/sharing/?token=232b62d7-8322-4ece-a693-4be53fe2ff49"><span style="font-weight: 400;">6.5</span></a><span style="font-weight: 400;"> - PGRR118, Related to NPRR1246, Energy Storage Resource Terminology Alignment for the Single-Model Era</span></p>
<ul>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Motion to table PGRR118 added to the combo ballot.</span></li>
</ul>
<p><a href="/sharing/?token=53ecfca1-432b-4805-a3ad-448746de79fb"><span style="font-weight: 400;">7</span></a><span style="font-weight: 400;"> - NPRR1246, Energy Storage Resource Terminology Alignment for the Single-Model Era - Possible Vote - Katie Rich</span></p>
<ul>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Motion to request PRS to table NPRR1246 added to the combo ballot.</span></li>
</ul>
<p><a href="/sharing/?token=f0179613-87d3-4c92-b738-77df860f4623"><span style="font-weight: 400;">8</span></a><span style="font-weight: 400;"> - OBDRR052, Related to NPRR1246, Energy Storage Resource Terminology Alignment for the Single-Model Era - Possible Vote - Katie Rich</span></p>
<ul>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Motion to request TAC continue to table OBDRR052 added to the combo ballot.</span></li>
</ul>
<p><a href="/sharing/?token=14b7a686-34df-4151-b55e-431b70a97ac0"><span style="font-weight: 400;">9</span></a><span style="font-weight: 400;"> - NPRR1229 - NPRR1239 - NPRR1240 - Revision Requests Tabled at PRS and Referred to ROS - Possible Vote - Katie Rich</span></p>
<ul>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">NPRR1229 is still under discussion at WMWG; no action needed currently.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Previous requests were made to table NPRR1239, NPRR1240, and associated PGRRs and NOGRRs for another month of review.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Chase from Southern Power supported moving forward with NPRR1239 and NPRR1240 after the additional review time.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">It was agreed that the associated NOGRRs and PGRRs can also move forward.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Confirmed addition to the combo for the mentioned revision requests.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">NPRR1239 - Motion to endorse NPRR1239 as submitted added to the combo ballot.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">NPRR1240 - Motion to endorse NPRR1240 as submitted added to the combo ballot.</span></li>
</ul>
<p> </p>
<p><a href="/sharing/?token=c93f714f-362f-41d6-8270-5beb24c3f030"><span style="font-weight: 400;">10</span></a><span style="font-weight: 400;"> - </span><span style="font-weight: 400;">Revision Requests Tabled at ROS (Possible Vote) Katie Rich </span></p>
<ul>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">PGRR073 - Not Mentioned.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">NOGRR266 - To recommend approval of NOGRR266 as submitted </span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">NOGRR267 - To recommend approval of NOGRR267 as submitted </span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">PGRR116- To recommend approval of PGRR116 as submitted </span></li>
</ul>
<p><a href="/sharing/?token=f879a30d-f397-44dd-b005-4e938370084d"><span style="font-weight: 400;">11</span></a><span style="font-weight: 400;"> - Operations Working Group </span><a href="https://ercot-control-docs.s3.us-west-2.amazonaws.com/30/11-owg_ros_20240909.pptx"><span style="font-weight: 400;">Report-</span></a><span style="font-weight: 400;"> OWG - Rickey Floyd</span></p>
<ul>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">ERCOT reached a new all-time peak for solar and renewable energy penetration.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Notice issued on 08/13/24 for IBR standards in accordance with FERC order 901.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">PRC-028 and PRC-030 were approved; PRC-020 failed.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">BAL-001 TRE SAR comment period ended; to be reviewed at MRC meeting in September and then potentially to a drafting team.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">TPL-008 was out for comment.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">SAR for EOP-012 was posted on the NERC site.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Workshop on cyber and physical security held on August 28 at Texas RE.</span></li>
</ul>
<p><a href="/sharing/?token=583037e3-fbc2-461f-aca2-31390a34ba2b"><span style="font-weight: 400;">11.1</span></a><span style="font-weight: 400;"> - Major Transmission Elements - MTE - list - Vote - Pushkar Chhajed</span></p>
<ul>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">ERCOT posted a public submission for the MTE list.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Motion to o endorse the MTE List as presented added the combo ballot.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">The TDSP reviewed the changes with no comments.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">No additions were made to the list.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">The OWG achieved consensus on the list and recommended ROS endorsement.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">There was no OTWG update at the meeting.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Discussion on 2024 UFLS survey results was skipped.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Discussed ancillary service methodology review with no proposed changes for RRS in 2025.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">ECRS reserved capacity computation proposals for 2025 include:</span></li>
<ul>
<li style="font-weight: 400;" aria-level="2"><span style="font-weight: 400;">Compute minimum ECRS requirements based on largest capacity needs.</span></li>
<li style="font-weight: 400;" aria-level="2"><span style="font-weight: 400;">Compute capacity needed to recover frequency using 70th percentile of historic inertia.</span></li>
<li style="font-weight: 400;" aria-level="2"><span style="font-weight: 400;">Remove risk coverage during sunset hours to at least 90th percentile.</span></li>
</ul>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Non-Spin reserve methodology for 2025 includes one proposed change:</span></li>
<ul>
<li style="font-weight: 400;" aria-level="2"><span style="font-weight: 400;">Compute Non-Spin quantities for hour ending 23 to hour ending 6 using 4-hour ahead hourly average net load forecast error.</span></li>
</ul>
</ul>
<p><a href="/sharing/?token=5915bce0-49e2-4e2b-8700-852af41d4a45"><span style="font-weight: 400;">11.2</span></a><span style="font-weight: 400;"> - NPRR1070, Planning Criteria for GTC Exit Solutions - OWG, PLWG - Possible Vote</span></p>
<ul>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">NPRR1070 is still being worked on by ERCOT with the PUC staff.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">The item remains tabled at OWG.</span></li>
</ul>
<p><a href="/sharing/?token=e8da5680-015a-468e-816c-979fccee28eb"><span style="font-weight: 400;">11.3</span></a><span style="font-weight: 400;"> - </span><span style="font-weight: 400;">NPRR1238, Voluntary Registration of Loads with Curtailable Load Capabilities </span></p>
<ul>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Discussed NPRR1238 voluntary registration of loads with curtailable load capabilities</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Significant discussion on the topic</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">ERCOT working on comments</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Oncor provided numerous comments</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">ERCOT reviewed Oncor’s comments and found alignment with their own</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Update expected at the next meeting</span></li>
</ul>
<p><a href="/sharing/?token=fa8ca813-f53a-4b82-aae4-24b61e6c322e"><span style="font-weight: 400;">11.4</span></a><span style="font-weight: 400;"> - NOGRR265, Related to NPRR1238, Voluntary Registration of Loads with Curtailable Load Capabilities - OWG - Possible Vote</span></p>
<ul>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">NOGRR265 related to NPRR1238 remains tabled.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">A few recommendations were made:</span></li>
<ul>
<li style="font-weight: 400;" aria-level="2"><span style="font-weight: 400;">Changing the update frequency list from four times a year to two times a year.</span></li>
<li style="font-weight: 400;" aria-level="2"><span style="font-weight: 400;">Synchronized with the winter and summer large shed tables.</span></li>
</ul>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">CPS was expected to provide comments; they were not present at the meeting and had not submitted comments yet.</span></li>
</ul>
<p><a href="/sharing/?token=847dd89d-c6a4-4e76-b439-95d2b9be26ad"><span style="font-weight: 400;">12</span></a><span style="font-weight: 400;"> - Planning Working Group - PLWG - Dylan Preas</span></p>
<p><a href="/sharing/?token=6e5cdbf0-0092-449d-9273-1a87cd5f9090"><span style="font-weight: 400;">12.1</span></a><span style="font-weight: 400;"> - PGRR107, Related to NPRR1180, Inclusion of Forecasted Load in Planning Analyses - PLWG - Possible Vote</span></p>
<ul>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">PLWG consensus on PGRR107 based on ERCOT comments from July 15.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Recommendation to change terminology from 'load' to 'load or load forecast' in NPRR1180.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Discussion on capitalization of 'load' to be consistent in ERCOT protocols and planning guide.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">ERCOT August 28 comments to change uppercase 'L' to lowercase 'l' in planning guide section 3.1.7, except for 'DC Tie Load' which remains uppercase.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Motion to recommend approval of PGRR107 as amended by the 8/28/24 ERCOT comments as revised by ROS added to combo ballot.</span></li>
</ul>
<p><a href="/sharing/?token=75f83e2a-c132-4ef7-b046-18094bf8af79"><span style="font-weight: 400;">12.2</span></a><span style="font-weight: 400;"> - PGRR115, Related to NPRR1234, Interconnection Requirements for Large Loads and Modeling Standards for Loads 25 MW or Greater - PLWG - Possible Vote</span></p>
<ul>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">ERCOT reviewed reply comments to Steel Mills comments, focusing on remote control disconnect requirements for industrial facilities.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Existing large loads raise concerns, particularly around industrial facilities.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Potential revision requests might limit how much load can be served at a single station to mitigate frequency events.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Language impacting ERCOT maintenance outage reliability criteria in section four of the planting guide was discussed.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Recommendation to keep this item tabled for further discussion.</span></li>
</ul>
<p><a href="/sharing/?token=301cc920-daf6-4152-8ae7-b12665ddd4d7"><span style="font-weight: 400;">12.3</span></a><span style="font-weight: 400;"> - PGRR117, Addition of Resiliency Assessment and Criteria to Reflect PUCT Rule Changes - PLWG - Possible Vote</span></p>
<ul>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">ERCOT can recommend transmission projects to address identified resiliency issues.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">The item was tabled for further language refinement.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">NPRR1247, although not formally assigned, discussed system-wide energy cost reduction as a test for congestion cost savings.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">ERCOT provided an overview of language incorporating this test into planning criteria.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">PLWG is tracking NERC roundtable topics, including revisions to NERC CIP-014-4 and new reliability standard NERC TPL-008-1.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Open action item NPRR1070 on planning criteria for GT exit solutions remains tabled pending draft revision.</span></li>
</ul>
<h3><strong>Action Items:</strong></h3>
<ul>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Add assignment to review PGRR107 language to PLWG action items.</span></li>
</ul>
<p><a href="/sharing/?token=451cdfe1-751a-4dc3-8859-58461d641dfd"><span style="font-weight: 400;">13</span></a><span style="font-weight: 400;"> - Network Data Support Working Group - NDSWG - Gerardo Escamilla</span></p>
<ul>
<li style="font-weight: 400;" aria-level="1"><a href="https://ercot-control-docs.s3.us-west-2.amazonaws.com/30/13-ndswg_report_to_ros_09_09_24.pptx"><span style="font-weight: 400;">Presentation</span></a><span style="font-weight: 400;"> and endorsement of NPRR1234 for modeling of single-owner loads of 25 megawatts or greater.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">NPRR1234 involves reporting for every load, identifying whether it is commercial or residential, and specifying if it carries a single 25 MW load or multiple loads.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">The endorsed NPRR will be part of normal procedures but discussions will continue at the next meeting on September 17.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Current understanding is that NPRR1234 will be provided as an attachment in modeling reports.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">No further questions or comments were raised.</span></li>
</ul>
<p><a href="/sharing/?token=e74cb571-df69-4fc0-b07d-61dc5ab98acd"><span style="font-weight: 400;">14 </span></a><span style="font-weight: 400;">- Dynamics Working Group </span><a href="https://ercot-control-docs.s3.us-west-2.amazonaws.com/30/14-dwg-report-to-ros-august-2024.pptx"><span style="font-weight: 400;">Update</span></a><span style="font-weight: 400;"> - DWG - Paul Koberlein</span></p>
<ul>
<li style="font-weight: 400;" aria-level="1"><strong>Instability in QSA study</strong></li>
<ul>
<li style="font-weight: 400;" aria-level="2"><span style="font-weight: 400;">Identified instability not solvable by curtailment</span></li>
<li style="font-weight: 400;" aria-level="2"><span style="font-weight: 400;">Caused by low short circuit ratio under p6 contingency</span></li>
<li style="font-weight: 400;" aria-level="2"><span style="font-weight: 400;">Solutions include reducing capacity or tuning inverter controls</span></li>
<li style="font-weight: 400;" aria-level="2"><span style="font-weight: 400;">FIS mitigation plans are helpful for TSPs</span></li>
</ul>
<li style="font-weight: 400;" aria-level="1"><strong>TSP Dynamic Devices </strong></li>
<ul>
<li style="font-weight: 400;" aria-level="2"><span style="font-weight: 400;">Clarification of requirements</span></li>
<li style="font-weight: 400;" aria-level="2"><span style="font-weight: 400;">ERCOT updated model quality guide in July</span></li>
<li style="font-weight: 400;" aria-level="2"><span style="font-weight: 400;">Presented details at IBR Working Group</span></li>
<li style="font-weight: 400;" aria-level="2"><span style="font-weight: 400;">Refer to DWG procedure manual, planning guide section 6.2, and model quality guide for full details</span></li>
</ul>
<li style="font-weight: 400;" aria-level="1"><strong>Flat start cases status update</strong></li>
<ul>
<li style="font-weight: 400;" aria-level="2"><span style="font-weight: 400;">Flat start tools updated to accommodate no breaker changes</span></li>
<li style="font-weight: 400;" aria-level="2"><span style="font-weight: 400;">First pass provided on 9/5/24</span></li>
<li style="font-weight: 400;" aria-level="2"><span style="font-weight: 400;">Feedback requested by 9/19/24</span></li>
</ul>
<li style="font-weight: 400;" aria-level="1"><strong>GFM update</strong></li>
<ul>
<li style="font-weight: 400;" aria-level="2"><span style="font-weight: 400;">ERCOT creating requirements and testing protocols for grid forming control systems</span></li>
<li style="font-weight: 400;" aria-level="2"><span style="font-weight: 400;">Draft PGRR and NOGRR languages to be presented during September IBR Working Group</span></li>
</ul>
<li style="font-weight: 400;" aria-level="1"><strong>Stability assessment for interim large load review</strong></li>
<ul>
<li style="font-weight: 400;" aria-level="2"><span style="font-weight: 400;">Clarification requested from ERCOT on when stability assessments are needed</span></li>
<li style="font-weight: 400;" aria-level="2"><span style="font-weight: 400;">Current requirement: TSPs study every large load</span></li>
<li style="font-weight: 400;" aria-level="2"><span style="font-weight: 400;">Previous attempt for a screening study in 2023 was tabled due to lack of consensus</span></li>
<li style="font-weight: 400;" aria-level="2"><span style="font-weight: 400;">Discussion to be reopened in October DWG meeting</span></li>
</ul>
<li style="font-weight: 400;" aria-level="1"><strong>DWG leadership</strong></li>
<ul>
<li style="font-weight: 400;" aria-level="2"><span style="font-weight: 400;">Vice chair agreed to serve as chair next year</span></li>
<li style="font-weight: 400;" aria-level="2"><span style="font-weight: 400;">Seeking volunteer for 2025 vice chair</span></li>
<li style="font-weight: 400;" aria-level="2"><span style="font-weight: 400;">Nomination hoped for next DWG meeting</span></li>
</ul>
</ul>
<p><a href="/sharing/?token=1e357e1c-8682-4a6d-9747-8d5fce0b5630"><span style="font-weight: 400;">14.1</span></a><span style="font-weight: 400;"> - DWG Procedure Manual</span></p>
<ul>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Received and addressed all comments on the </span><a href="https://ercot-control-docs.s3.us-west-2.amazonaws.com/30/14-draft-dwg_procedure_manual_revision_21_nogrr245-draft-.docx"><span style="font-weight: 400;">latest draft</span></a><span style="font-weight: 400;"> of the DWG procedure manual.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Discussion on the draft took place at the last IBR working group meeting workshop.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Anticipating PUC decision on NOGRR245 in September.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">DWG aims to request ROS approval of the procedure manual in October.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Draft procedure manual is posted on the DWG landing page for review.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Clarification sought and given: DWG is only discussing the manual today and will seek approval at ROS next month.</span></li>
</ul>
<h3><strong>Next Steps</strong></h3>
<ul>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Await PUC decision on NOGRR245 in September.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Seek ROS approval of the DWG procedure manual in October.</span></li>
</ul>
<p><a href="/sharing/?token=48c50b1a-9853-4941-9d8b-86b1e39c4c86"><span style="font-weight: 400;">15</span></a><span style="font-weight: 400;"> - Combo Ballot - Vote - Katie Rich</span></p>
<p><span style="font-weight: 400;"><img src="/storage/docs/2024/09/Sept%20ROS%20Combo%20Details.png" width="582" height="165" /></span></p>
<p><span style="font-weight: 400;"><img src="/storage/docs/2024/09/Sept%20ROS%20Combo.png" width="582" height="560" /></span></p>
<p><a href="/sharing/?token=10e13be4-7920-4e4d-ae58-2d376100d823"><span style="font-weight: 400;">16</span></a><span style="font-weight: 400;"> - Inverter Based Resources Working Group - IBRWG - Julia Matevosyan</span></p>
<ul>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Julia Matevosyan provided the </span><a href="https://ercot-control-docs.s3.us-west-2.amazonaws.com/03/16-ibrwg-report-to-ros-090924.docx"><span style="font-weight: 400;">update</span></a></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Discussion with SPWG on outreach closing schemes to ensure no conflicts with multiple ride-through requirements for IBRs. SAWG to review IEEE 2800 requirements and adjust schemes if necessary.</span></li>
</ul>
<ul>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Discussion on RoCoF and phase jump measurements, considering the correct measuring window and the impact on IBRs.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Collaboration with DWG on procedure manual changes, with detailed responses from ERCOT to comments and proposed new tests</span></li>
</ul>
<ul>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Ongoing DOE initiatives and NERC standard efforts focusing on IBRs and IEEE 2800 adoption.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Updates on PRC-028 and PRC-030 standards, which have passed their last ballot, while PRC-029 did not pass. A technical conference will be held to address industry disagreements on PRC-029.</span></li>
</ul>
<p><a href="/sharing/?token=aa65a6d6-9d86-45f8-9b77-44e9317b6af2"><span style="font-weight: 400;">17</span></a><span style="font-weight: 400;"> - Performance, Disturbance, Compliance Working Group - PDCWG - Kevin Bunch</span></p>
<ul>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Kevin Bunch provided the </span><a href="https://ercot-control-docs.s3.us-west-2.amazonaws.com/30/17-pdcwg-report-to-ros_090924.pptx"><span style="font-weight: 400;">update</span></a></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Primary discussion revolved around the 2025 methodology and frequency control metrics.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Current average is 14.31, significantly higher than the required 3.95.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Discussed SAR for clarification on requirement six, now including ESRs.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Comment period for SAR is closed.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Two new ICCP tags were released by ERCOT, sending total curtailment for solar and wind to all QSEs</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">No disturbances reported for July; no FMEs to review.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Next IBRWG meeting in September to discuss performance of IBRs during deep curtailment, particularly wind response during frequency events.</span></li>
</ul>
<p><a href="/sharing/?token=8218388c-60e9-4b45-87b1-1071b1146aaf"><span style="font-weight: 400;">18</span></a><span style="font-weight: 400;"> - Steady State Working Group - SSWG - William Robertson</span></p>
<p><span style="font-weight: 400;"> </span></p>
<ul>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">No concerns from SSWG standpoint that would cause late posting.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Introduction of new load ID prefixes related to House Bill 5066 by ERCOT.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Pushback from some TSPs within SSWG on the new load ID prefixes.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Decision to wait until PGRR115 and NPRR1234 get more time and go through ROS before making changes.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">ERCOT to come back and consolidate some of the existing load ID prefixes and discuss them at the next SSWG meeting at the end of September.</span></li>
</ul>
<p><a href="/sharing/?token=6e667d5d-f225-4d71-969f-5cb3f81d4b0f"><span style="font-weight: 400;">19</span></a><span style="font-weight: 400;"> - Voltage Profile Working Group </span><a href="https://ercot-control-docs.s3.us-west-2.amazonaws.com/30/19-vpwg_update_to_ros_aug_27.pptx"><span style="font-weight: 400;">Update</span></a><span style="font-weight: 400;"> - VPWG - Maribel Khayat</span></p>
<ul>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Winter/spring voltage profile kickoff occurred.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Generator voltage performance report deferred to next year's first quarter.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">ERCOT notified that some TSPs might receive invites to discuss exceedances in their service territory.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Next meeting scheduled for November 5.</span></li>
</ul>
<p><a href="/sharing/?token=16d6905d-2938-47cd-a155-f2e67b095e96"><span style="font-weight: 400;">20</span></a><span style="font-weight: 400;"> - Operations Training Working Group - OTWG - Manuel Sanchez</span></p>
<ul>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">No new updates for this month.</span></li>
</ul>
<p><a href="/sharing/?token=c26e4fca-d6b4-42a1-a513-a464351273d2"><span style="font-weight: 400;">21</span></a><span style="font-weight: 400;"> - Black Start Working Group - BSWG - Michael Dieringer</span></p>
<ul>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Communication: Requesting ERCOT to conduct RFI on satellite phones and third-party data lines.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Dynamic frequency and reactive response: ERCOT to check OT training on SIP and simulate battery capabilities.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Requested grid forming, reactive support, and load balancing capabilities details.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Potential simulation benefits and processes for transmission projects with reactive devices to expedite Blackstart restoration.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Discussion on mutual assistance tabled.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Blackstart working group to discuss developing a new CBT for generator participants.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Requested ERCOT to perform a study or RFI on upgrading isochronous machines.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Constant frequency control: Discussions with QSEs on generator groups’ constant frequency control during state separation.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Blackstart gas coordination: Seeking more participation and information from the gas industry.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Dynamic verification: Reviewing ERCOT training for realistic simulation scenarios and possibly using Epery's tool.</span></li>
</ul>
<ul>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Next meeting on 09/19/23</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Encouraged generator participation in upcoming meeting.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Action item for POWG added and reviewed.</span></li>
</ul>
<p><a href="/sharing/?token=5f452a36-f428-4b96-bcd6-d36fe4e33898"><span style="font-weight: 400;">22</span></a><span style="font-weight: 400;"> - Other Business - Katie Rich</span></p>
<ul>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">No additional business was discussed.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Next meeting scheduled for October 3.</span></li>