<p><img src="/storage/docs/2024/04/ECRS.png" width="568" height="429" /></p>
<p><span style="font-weight: 400;">5 - ERCOT Operations and Market Items - Eric Blakey</span></p>
<p><span style="font-weight: 400;"><a href="/sharing/?token=fa0df35a-7fd6-46f2-aaf7-68749b4f2580" target="_blank" rel="noopener">5.2</a> - Update on 2023 Maximum Daily Resource Planned Outage Capacity - MDRPOC - Performance and Methodology Review Timeline - Luke Butler</span></p>
<ul>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Required to be presented to TAC and approved annually, but was pushed to WMS due to time constraints related to NOGRR245 discussion. </span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">ERCOT presented MDRPOC methodology</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Current process requires that changes to methodology go through market notice and 14-day comment period, generally after input from TAC, ROS, and WMS. </span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">TCPA plans to work on an NPRR for process improvement.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Recommendations made to include the future trend of MDRPOC in the analysis and provide data on the use of other resources for cushioning.</span></li>
</ul>
<p><span style="font-weight: 400;"><a href="/sharing/?token=6cf55749-4b26-4cbc-acf9-7f86f603d269" target="_blank" rel="noopener">5.3</a> - March Request Regarding RUC of Resource with Long Min. Run Time - Luis Hinojosa</span></p>
<ul>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Mr. Hinojosa discussed the manual RUC instructions issued by operators on March 4 and 5, explaining the considerations: 1) tight conditions of the Committed Capacity Margin (CCM) due to updates in unit COPs, 2) net load forecasts, and 3) available units with a short enough start time to address operator concern. .</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Bill Barnes of NRG raised questions about whether the RUC engine considers the full cost of min-energy requirements for long min. run time units, receiving the answer from Dave Maggio that the RUC engine does not look at costs beyond the horizon of the study period</span></li>
<li style="font-weight: 400;" aria-level="1"><a href="/sharing/?token=89d7b740-2037-43e9-8dd4-d1eca038acc1" target="_blank" rel="noopener">5.4</a> - Discuss Potential Changes to ECRS Deployment/Release Triggers for Summer 2024 - Nitika Mago/Luis Hinojosa</li>
</ul>
<ul>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">ERCOT is not considering changes for minimum ECRS requirements for 2024; focus is on changing when and how ECRS is released in real-time.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Manual ECRS triggers were not designed for scarcity days with limited dispatch capacity.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Three trigger options were proposed by the IMM, with a decision made at the 3/19 workshop to implement option two by summer 2024, namely releasing ECRS chunks based on a system power balance constraint violation of 30 MW for 10 consecutive minutes.</span></li>
</ul>
<p><span style="font-weight: 400;"><a href="/sharing/?token=8499f89a-a652-4f2b-96a0-bd2e9c04f63b" target="_blank" rel="noopener">5.5</a> - NPRR1224, ECRS Manual Deployment Triggers - Waive Notice – Possible Vote</span></p>
<ul>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">The trigger condition being considered is the ability to release SCED dispatchable ECRS up to 500 Megawatt chunks based on power balance penalty, wherein SCED base points are less than generation to be dispatched consistently for 10 consecutive minutes with a penalty value of 30 Megawatts for a total SCED-based generation.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Additional discussion included AS demand curves for RTC and consideration of when to release 500 Megawatts of SCED dispatchable ECRS.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Analysis was requested on alternative values based on the power balance violation and duration. Stakeholders expressed concerns about the NPRR's ability to address the underlying issue with how the ECRS market led to unusual conditions last summer and requested more analysis.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Suggestions were made to consider a price floor based on manual deployments to avoid price reversal and concerns were raised about the under generation trigger and the power balance penalty curve.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">No vote taken, MPs wanted to take time between WMS and PRS to consider the issues.</span></li>
</ul>
<p><span style="font-weight: 400;"><a href="/sharing/?token=ebdc9c40-35fb-41e4-b35c-91da1b6ceebb" target="_blank" rel="noopener">5.6</a> - FFSS Report - Ryan King</span></p>
<ul>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">ERCOT explained FFSS deployments as required by protocol.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;"> ERCOT is preparing NPRR based on lessons learned for clarity around fuel restocking process, method of notification, HTO override, and resource availability</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Some FFSS resources had issues coming online or staying online, will incur 90-day clawback charges. ERCOT will entertain stakeholder input on adjusting clawback structure and adding a sliding scale instead of a binary clawback. </span></li>
</ul>
<p><span style="font-weight: 400;"><a href="/sharing/?token=1bed1406-95f2-4051-8118-7c522fdc1e7e" target="_blank" rel="noopener">6</a> - Resource Cost Working Group - RCWG - Blake Holt</span></p>
<ul>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">RCMWG did not meet last month. Still waiting on VCMRR, need NPRR from ERCOT on a new coal fuel adder process.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Confirmation of Kiran Sudhu of E360 Power as vice-chair of RCWG moved to combo ballot. </span></li>
</ul>
<p><span style="font-weight: 400;"><a href="/sharing/?token=84b282ac-4714-4e0b-aabd-6cc189197529" target="_blank" rel="noopener">8</a> - Wholesale Market Working Group - WMWG - Leadership - Kevin Hanson</span></p>
<ul>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Kevin Hanson and Blake Holt of LCRA were selected as the chair and vice chair of the Wholesale Market Working Group.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Zhengguo Chu presented on the reliability deployment price adder</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Discussion on NPRR1216, with comments from ERCOT and TCPA</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Sam Fabricant from ERCOT presented updates on the AS capacity monitor</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Alfredo Moreno presented on the DAM PTP activity update</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Brief discussion on NPRR1190</span></li>
</ul>
<p><span style="font-weight: 400;"><a href="/sharing/?token=87e1698d-16e7-4873-9815-29cd5dfca0cd" target="_blank" rel="noopener">9 </a>- Congestion Management Working Group - CMWG - Seth Cochran</span></p>
<ul>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">NPRR1214 reliability deployment price adder fix was discussed, with hypothetical scenarios presented and request was made for more detailed examples using raw data.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Eric Goff requested analysis of total impacts of NPRR1214, such a study would be resource-intensive so ERCOT cannot commit to providing it in the near term.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Discussed ESR mitigation and explored the CAISO and NPRR826 frameworks</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Discussed NPRR1198 and NOGRR258 congestion mitigation using topology reconfigurations with a consensus to return back to WMS, recommending endorsement with transparency issues resolved.</span></li>
</ul>
<p><span style="font-weight: 400;"><a href="/sharing/?token=64a162ca-6e4e-4848-9f48-fc83283e7cbb" target="_blank" rel="noopener">10</a> - Supply Analysis Working Group - SAWG - Kevin Hanson</span></p>
<ul>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Brattle presented the reference technology selection for the cone study.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Proposed technology for cone study: Proenergy GE LM6000PC with SPRINT. 8x0 configuration with 484 MW capacity, fired by natural gas with SCR, located in Harris County, utilizing well water.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Alternative technology proposed: PV + BESS Hybrid: 200 MW PV and 100 MW BESS with 2-hour duration storage.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Reliability standards scenario study discussion: Phase four modeling simulations completed, phase three simulations re-run due to software bug, expected results to be presented at the April 11th PUC open meeting.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">VOLL study project updates filed March 14th, survey completion expected by the end of Q3 2024. </span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Also discussed Reliability VOLL study updates, two NPRRs related to CDR and CONE/PNM, respectively</span></li>
</ul>
<p><span style="font-weight: 400;">11 - WMS Revision Requests Tabled at WMS - Possible Vote - Eric Blakey</span></p>
<p><span style="font-weight: 400;"><a href="/sharing/?token=4b137981-b448-4111-ae25-bf1b9b939b7d" target="_blank" rel="noopener">11.1</a> - SMOGRR028, Add Series Reactor Compensation Factors - MWG</span></p>
<ul>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">SMOGRR028 has been referred to WMWG, remains tabled.</span></li>
</ul>
<p><span style="font-weight: 400;"><a href="/sharing/?token=5d76e239-ac5c-48ab-9d47-f3af6590e201" target="_blank" rel="noopener">11.2</a> - VCMRR039, Related to NPRR1216, Implementation of Emergency Pricing Program - WMWG - Eric Blakey</span></p>
<ul>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">WMWG report suggests that discussions on these items will continue, remains tabled.</span></li>
</ul>
<p><span style="font-weight: 400;">12 - New Protocol Revision Subcommittee - PRS - Referrals - Vote - Eric Blakey</span></p>
<p><span style="font-weight: 400;"><a href="/sharing/?token=29e78255-f667-46d6-931f-6882b4f05da5" target="_blank" rel="noopener">12.1</a> - NPRR1219, Methodology Revisions and New Definitions for the Report on Capacity, Demand and Reserves in the ERCOT Region - CDR</span></p>
<ul>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Referred to WMS by PRS for methodology revisions and new definitions for the report.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Motion to table and refer to SAWG placed on combo ballot.</span></li>
</ul>
<p><span style="font-weight: 400;"><a href="/sharing/?token=7b8f26a4-2b51-4f0b-ba95-858c1b42377c" target="_blank" rel="noopener">13</a> - Revision Requests Tabled at PRS and Referred to WMS - Possible Vote - Eric Blakey</span></p>
<ul>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">NPRR1070 and NPRR1162 remain tabled.</span></li>
</ul>
<p><span style="font-weight: 400;"><a href="/sharing/?token=a5b90446-ba9f-4de7-8d40-70207b9228c8" target="_blank" rel="noopener">13.3</a> - NPRR1190, High Dispatch Limit Override Provision for Increased NOIE Load Costs - WMWG</span></p>
<ul>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">NPRR1190 is officially at WMWG, parties have requested for more time to review it and bring it back to WMS for a vote next month.</span></li>
</ul>
<p><span style="font-weight: 400;"><a href="/sharing/?token=6797fee6-537d-4346-bcb7-bb44886b1460" target="_blank" rel="noopener">13.4</a> - NPRR1198, Congestion Mitigation Using Topology Reconfigurations - CMWG</span></p>
<ul>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Added to combo ballot with LCRA comments filed on March 8th</span></li>
</ul>
<p><span style="font-weight: 400;">13.5 - NPRR1200, Utilization of Calculated Values for Non-WSL for ESRs (MWG)</span></p>
<ul>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">NPRR1200 can remain tabled at MWG</span></li>
</ul>
<p><span style="font-weight: 400;"><a href="/sharing/?token=e74ee53d-a98e-4202-860b-a88ccbe620f2" target="_blank" rel="noopener">13.6 </a>- NPRR1202, Refundable Deposits for Large Load Interconnection Studies</span></p>
<ul>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">NPRR1202 is waiting on the Large Flexible Load Task Force for further developments.</span></li>
</ul>
<p><span style="font-weight: 400;"><a href="/sharing/?token=a6426bdc-6975-41a2-9fa4-9a0d6a68b3ac" target="_blank" rel="noopener">13.7</a> - NPRR1214, Reliability Deployment Price Adder Fix to Provide Locational Price Signals, Reduce Uplift and Risk - CMWG</span></p>
<ul>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">NPRR1214 and NPRR1216 discussions to continue next month</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">OBDRR51 discussions also remain tabled</span></li>
</ul>
<ol start="14">
<li><a href="/sharing/?token=1437444d-de20-4dd9-87f7-b687e9c173da" target="_blank" rel="noopener"><span style="font-weight: 400;"> Combo Ballot</span></a></li>
</ol>
<ul>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">March 6, 2024 WMS Meeting Minutes - To Approve the March 6, 2024 WMS meeting minutes as submitted </span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">RCWG Leadership - To endorse Vice Chair Kiran Sidhu, e360 Power</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">MSWG Leadership - To endorse Vice Chair Shuye Teng, Constellation</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">WMWG Leadership - To endorse Chair Kevin hanson, National Grid and Vice Chair Blake Holt, LCRA</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">NPRR1219 - To request PRS continue to table NPRR1219 for further review by SAWG</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">NPRR1198 - To endorse NPRR1198 as amended by the 03/08/24 LCRA comments.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Motion carries with one abstention.</span></li>
</ul>
<p><span style="font-weight: 400;"><a href="/sharing/?token=10ecb9f7-13df-4097-97c0-0df1556d31e8" target="_blank" rel="noopener">15</a> - Other Business - Eric Blakey</span></p>
<ul>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">The CRR auction for the 2026 2nd six months annual sequence six is facing performance issues and will be delayed.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">A market notice will be sent with the updated dates based on the current run.</span></li>
</ul>